Energetic Center FENIX Jeseník

The area consists of a complex of renovated and new production halls with adjoining brownfield areas with potential for further development. Automated lines are widely used in the production processes, including cutting and bending centers for sheet metal processing, welding and handling robotic workplaces, powder coating facilities, and extrusion lines for cable production.
Areas of PV on production halls
SAS battery storage in container configuration
Example of a sunny working day period. During times of high prices in the morning and evening, the battery is discharged, reducing the consumption from the distribution network. The battery is charged during the lowest price times after noon - both from the grid and from surplus PV

The production area of ​​FENIX s.r.o. ensures, within the FENIX GROUP a.s. group, especially the production of the ECOFLOOR range of heating cables, ECOSUN radiant panels, and now also HES and MES battery storage systems. All production, storage, and office spaces are heated exclusively by electric radiant heating. The reserved power is negotiated within the range of 600-750 kW throughout the year. The average electricity consumption of the entire area is approximately 3 GWh per year.

Building the EC FENIX - photovoltaics and battery storage

A new Energy Center was built in the production area of ​​FENIX s.r.o. in Jeseník between 2022 and 2023. The aim of the project was to ensure a higher level of energy self-sufficiency and reduce operating costs during the energy crisis. In the autumn of 2022, the installation of new photovoltaic power plants began. The original installed capacity of approximately 130 kWp was gradually increased to the current 891 kWp in this stage - the installation took place on free roofs, but also on building walls or ground structures.

In January 2023, a new SAS battery storage system with a total capacity of 2.4 MWh and a power output of 720 kW was also launched. The equipment is installed in two shipping containers and is directly connected to the substation at the entrance to the area. This new storage complements the original solution with a capacity of just under 600 kWh and a power output of 720 kW from 2019, which is installed in the technical room of one of the production buildings and primarily provides energy backup for the area, protection against micro-outages, and trimming of consumption peaks. The total capacity within the battery storage systems thus currently amounts to almost 3 MWh. The system was designed with the aim of maximizing the use of self-generated energy directly in the area in connection with automatic optimization of electricity purchase and supply within the spot market.

Practical operation of the system

The FENIX Energy Center is managed by a control system that ensures monitoring of current consumption and PV production. At the same time, so-called spot hourly prices for power electricity are always loaded for the following day, and the sunlight forecast is evaluated - based on this information, the algorithm then generates a behavior plan that determines the times when the battery storage will be charged from the grid or from PV surpluses, when the battery will compensate for the area's consumption, thus reducing the consumption from the distribution network, and when, on the contrary, the battery storage will supply excess energy to the grid at a favorable price. The entire process is automated and does not require manual intervention.

Operational results for 2023

Period Total
consumption
(kWh)
Grid
consumption
(kWh)
PV
production
(kWh)
Supply
to grid
(kWh)
Grid
consumption
(CZK)
Distribution
payments
(CZK)
Supply
to grid
(CZK)
Electricity
costs
(CZK)
Achieved
price
(CZK/kWh)
01/2023 329 000 318 432 11 000 423 1 114 069 194 619 132 1 308 556 3,98
02/2023 270 050 254 054 16 040 46 888 806 177 619 78 1 066 347 3,95
03/2023 252 116 215 497 39 951 3 332 616 351 168 867 3 491 781 727 3,10
04/2023 194 526 158 590 43 360 7 424 442 055 148 101 5 527 584 629 3,01
05/2023 174 248 118 668 71 226 15 646 272 752 140 232 15 418 397 566 3,01
06/2023 150 822 83 735 81 889 14 802 214 833 133 338 20 810 327 361 2,17
07/2023 101 738 48 461 93 084 39 807 120 738 126 416 59 977 187 177 1,84
08/2023 160 843 101 412 72 590 13 159 228 809 136 819 20 159 345 469 2,15
09/2023 133 953 72 642 78 246 16 935 192 244 131 140 30 406 292 978 2,19
10/2023 154 912 113 788 46 592 5 468 296 116 139 258 7 379 427 995 2,76
11/2023 191 674 177 704 14 400 430 444 890 178 018 489 622 419 3,25
12/2023 185 807 177 997 8 510 700 423 600 174 639 268 597 971 3,22
Total 2 299 689 1 840 980 576 888 118 172 5 255 263 1 849 066 164 134 6 940 195 3,00

 

Without investing in the Energy Center (PV, storage, active SPOT), electricity costs would reach approximately CZK 14 million without VAT (with a consumption of 2.3 GWh and the government capped price of power electricity).

Investment costs in the Energy Center (after deducting the subsidy of CZK 11.5 million) amounted to CZK 45.5 million without VAT. For 2023, the annual savings amount to approximately CZK 7 million, so the current payback period is 6.5 years.

Operational results for 2024

Period Total
consumption
(kWh)
Grid
consumption
(kWh)
PV
production
(kWh)
Supply
to grid
(kWh)
Grid
consumption
(CZK)
Distribution
payments
(CZK)
Supply
to grid
(CZK)
Electricity
costs
(CZK)
Achieved
price
(CZK/kWh)
01/2024 267 261 256 519 10 922 180 580 004 415 675 150 995 529 3,72
02/2024 211 685 184 154 29 654 2 123 341 023 327 739 1 800 666 962 3,15
03/2024 184 309 132 441 56 128 4 260 241 376 267 965 4 582 504 759 2,73
04/2024 143 484 84 087 73 023 13 626 161 001 213 425 14 576 359 850 2,51
05/2024 109 714 53 323 75 449 19 058 90 512 196 958 27 922 259 548 2,36
06/2024 120 174 61 110 75 151 16 087 123 040 205 037 22 856 305 221 2,53
07/2024 112 203 50 779 82 021 20 597 93 736 194 341 30 997 257 080 2,29
08/2024 97 351 52 063 82 048 36 760 114 432 184 681 98 562 200 551 2,06
09/2024 * 100 083 71 494 38 700 10 111 137 260 202 089 16 488 322 861 3,23
10/2024 221 841 217 504 41 762 37 425 503 539 332 912 88 437 748 014 3,37
11/2024                  
12/2024                  
Total 1 568 105 1 163 474 564 858 160 227 2 385 923 2 540 882 306 370 4 620 375 2,94

* In September 2024, the data was affected by a high-voltage connection failure due to flooding, with some values distorted by communication outages. Power supply restoration from the grid was completed only after 12 days.